The £54m Hauxton Park and Ride by M11 junction 11 has been approved. Building starts in early 2027 and it should open in mid-2028 with 2,150 parking spaces.
A new park and ride with 2,150 parking spaces will be built west of the M11 at junction 11, near Hauxton. The Greater Cambridge Partnership’s Executive Board approved the £54 million scheme unanimously on 5 November. (GCP Executive Board decision summary, 5 November 2026)
Building is due to start in early 2027. The site is forecast to open in mid-2028. (Cambridge South West Travel Hub Full Business Case report, section 10)
Overview
- What: a new park and ride, called Hauxton Park and Ride, with three car parks and 2,150 spaces
- Where: west of M11 junction 11, between the A10 and the motorway, near Hauxton
- When: construction from early 2027, opening forecast for mid-2028
- Cost: a £54 million budget, with construction just over £40 million
- Buses: routes are still being agreed; the aim is direct buses to Addenbrooke’s and the Cambridge Biomedical Campus and to the city centre
What the board agreed
The board, meeting at South Cambridgeshire Hall in Cambourne, resolved to:
- agree the full business case for the scheme
- let the partnership’s service director sign a construction contract with the preferred bidder, chosen through the Eastern Highways Alliance framework
- name the site Hauxton Park and Ride, in line with the other park and rides around Cambridge
- ask officers to look at commercial uses for the site, including commercial units next to the building
The last point was added at the meeting. Councillor Tim Bick proposed it and Councillor Brian Milnes seconded it. (GCP Executive Board draft minutes, 5 November 2026)
The site was known as the Cambridge South West Travel Hub while it was being planned. Officers argued that “travel hub” could confuse people about what the site is for. Hauxton is the closest village, so the site takes its name.
What will be built
The report to the board lists:
- three car parks with 2,150 spaces
- a building with waiting areas, toilets, baby changing and an office
- 360 cycle parking spaces and 120 secure Velobox cycle lockers
- a new walking and cycling bridge over the M11, linking to Trumpington Meadows and Trumpington Park and Ride
- a bus-only route over the M11 using an existing accommodation bridge
- electric vehicle charging, and solar panels over one of the three car parks
Solar panels are planned for only one car park because of limits on grid capacity, the board was told. The position will be kept under review.
The Melbourn Greenway will run through the site. That gives cyclists from Melbourn, Shepreth and Harston a route over the M11 into Cambridge. (GCP, 5 October 2026)
Why the partnership says it is needed
Trumpington Park and Ride has about 1,600 spaces. The report says around 1,450 vehicles are regularly parked there in the middle of the day, about 90% of capacity. When it fills, drivers carry on into the city or to the Biomedical Campus by car.
The partnership forecasts that the new site will take 1,900 vehicle trips a day off the roads to the Biomedical Campus by 2031. It also says park and ride demand has risen by 24% since 2019. (GCP, 5 October 2026)
The business case gives a benefit cost ratio of 1.53. That means just over £1.50 of forecast benefit for every £1 spent.
Some concerns were raised about building on the Green Belt when the Joint Assembly discussed the scheme in October, the minutes record. The board was told the project should deliver a 40% biodiversity net gain, above the partnership’s own target.
Changes to the A10, Hauxton Road and the M11
To get traffic in and out, the report lists these road works:
| Road | Change |
|---|---|
| A10 | Approach to the M11 junction widened to dual carriageway |
| A10 | New signal-controlled junction with a right-turn lane into the park and ride |
| A1309 Hauxton Road | Northbound carriageway widened with extra lanes |
| A1309 Hauxton Road | Addenbrooke’s Road junction changed, with bus priority |
| M11 junction 11 | Northbound slip road widened to three lanes at the roundabout |
| M11 junction 11 | Parts of the roundabout widened from two lanes to three; new traffic signals |
The A10 work will be built alongside the existing road. The report says two lanes will stay open for most of the construction. Only the tie-ins will need heavier traffic management.
What it means for you
- If you drive in on the A10 or M11: expect roadworks at junction 11 from early 2027. No dates for lane closures have been published yet. We will add them to our South Cambs roadworks page when National Highways or the county council lists them.
- If you use Trumpington Park and Ride: nothing changes until the new site opens, forecast for mid-2028.
- If you cycle from Harston, Shepreth or Melbourn: the Melbourn Greenway will cross the M11 on the new bridge.
- Bus times and fares have not been set. The report says officers are working with bus operators and the Combined Authority on the services.
Have your say